Deprecated: Creation of dynamic property HelloNico\ACF\FieldLoader::$settings is deprecated in /var/www/stage_multisite/releases/20250805075012/wp-content/plugins/acf-country-2.0/acf-country.php on line 33
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf-country domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/stage_multisite/releases/20250805075012/wp-includes/functions.php on line 6121
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf-image_crop domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/stage_multisite/releases/20250805075012/wp-includes/functions.php on line 6121
Warning: Undefined array key "vicoda" in /var/www/stage_multisite/releases/20250805075012/wp-content/themes/lisega/single.php on line 11
Warning: Undefined array key "service" in /var/www/stage_multisite/releases/20250805075012/wp-content/themes/lisega/single.php on line 33
Warning: Undefined array key "service" in /var/www/stage_multisite/releases/20250805075012/wp-content/themes/lisega/single.php on line 33 Mürmann - New m.connect application field - LISEGA SE : LISEGA SE Warning: Undefined array key "contactPersons" in /var/www/stage_multisite/releases/20250805075012/wp-content/themes/lisega/functions.php on line 201
For a new assembly process a gas turbine manufacturer in Berlin needed to install in his production shop a 50-ton crane. This crane was required in addition to the three existing cranes in order to rotate heavy components. To disturb the work processes in operation as little as possible, it was decided to upgrade the existing crane track with m.connect compression and tension rods. For this purpose the rods were mounted between the reinforced concrete supports on the lower brace of the crane girder. The filigree m.connect solution enabled simple assembly with small, lightweight work platforms and without the need for welding. The advantages of this form of installation has persuaded the customer to upgrade the crane in another shop in the same way.