Mürmann – m.connect 重大改造工程
2. 五月 2018
Print
在德国因戈尔施塔特的一个历史遗址铸造厂内,一座现代艺术设计博物馆将于 2019 年建成。这将实现现代建筑技术与历史建筑的完美结合。为了在原先结构基础上创造额外的展览空间,一个大型地下室正在建设中。而只有将现有的钢结构和建筑中间的铸铁支架拆除,才能进行地下室的施工。解决方案是使用临时钢结构–预应力 M.连接张力杆系统。在建筑工程的基础上,钢结构将重建,旧支座将再次成为轴承结构的一部分。
acf-country
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (这个消息是在6.7.0版本添加的。) in /var/www/stage_multisite/releases/20250805075012/wp-includes/functions.php on line 6121acf-image_crop
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (这个消息是在6.7.0版本添加的。) in /var/www/stage_multisite/releases/20250805075012/wp-includes/functions.php on line 6121