Mürmann – 哥本哈根废物焚化厂
29. 八月 2018
Print
我们已经报告了2015年在哥本哈根建造了一个废物焚化厂,其屋顶要安装一个滑雪坡。穆尔曼为该项目提供了M 连接张力杆系统M64至M100 – 首先用于工艺大厦和大厅接待处,之后用于坡道区域。去年年底,此设计获得了“2017欧洲钢结构奖”, 其中特别高要求和建筑有趣的才可被授予。
acf-country
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (这个消息是在6.7.0版本添加的。) in /var/www/stage_multisite/releases/20250805075012/wp-includes/functions.php on line 6121acf-image_crop
domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init
action or later. Please see Debugging in WordPress for more information. (这个消息是在6.7.0版本添加的。) in /var/www/stage_multisite/releases/20250805075012/wp-includes/functions.php on line 6121