Deprecated: Creation of dynamic property HelloNico\ACF\FieldLoader::$settings is deprecated in /var/www/stage_multisite/releases/20250805075012/wp-content/plugins/acf-country-2.0/acf-country.php on line 33
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf-country domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/stage_multisite/releases/20250805075012/wp-includes/functions.php on line 6121
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf-image_crop domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/stage_multisite/releases/20250805075012/wp-includes/functions.php on line 6121
Warning: Undefined array key "vicoda" in /var/www/stage_multisite/releases/20250805075012/wp-content/themes/lisega/single.php on line 11
Warning: Undefined array key "service" in /var/www/stage_multisite/releases/20250805075012/wp-content/themes/lisega/single.php on line 33
Warning: Undefined array key "service" in /var/www/stage_multisite/releases/20250805075012/wp-content/themes/lisega/single.php on line 33 Vicoda Group - Vibration damping in Munich - LISEGA SE : LISEGA SE Warning: Undefined array key "contactPersons" in /var/www/stage_multisite/releases/20250805075012/wp-content/themes/lisega/functions.php on line 201
The former premises of the Paulaner Brewery in Munich is in future to be converted to a residential and business complex. However, due to a subway line nearby, vibrations regularly occur that, if no special measures are taken, could lead to impermissible vibrations in the buildings to be constructed. For this reason, as early as the planning phase a vibration insulated design of the buildings was planned. For this, at ground level between sub-base and basement, full-surface highly elastic matting is laid to separate the building completely from the ground surrounding it. By means of such a measure the passing subway trains are barely noticed and the value of the buildings considerably increased. Calenberg Ingenieure GmbH has been awarded the order for the supply and installation of their surface matting of the types Cibatur and Civerso.