Deprecated: Creation of dynamic property HelloNico\ACF\FieldLoader::$settings is deprecated in /var/www/stage_multisite/releases/20250805075012/wp-content/plugins/acf-country-2.0/acf-country.php on line 33
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf-country domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/stage_multisite/releases/20250805075012/wp-includes/functions.php on line 6121
Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf-image_crop domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/stage_multisite/releases/20250805075012/wp-includes/functions.php on line 6121
Warning: Undefined array key "vicoda" in /var/www/stage_multisite/releases/20250805075012/wp-content/themes/lisega/single.php on line 11
Warning: Undefined array key "service" in /var/www/stage_multisite/releases/20250805075012/wp-content/themes/lisega/single.php on line 33
Warning: Undefined array key "service" in /var/www/stage_multisite/releases/20250805075012/wp-content/themes/lisega/single.php on line 33 Mürmann - Pretensioning bracing components on a pedestrian bridge - LISEGA SE : LISEGA SE Warning: Undefined array key "contactPersons" in /var/www/stage_multisite/releases/20250805075012/wp-content/themes/lisega/functions.php on line 201
Mürmann – Pretensioning bracing components on a pedestrian bridge
22. January 2018
Print
The final assembly work is currently being carried out on a new pedestrian bridge in Hinterweidenthal, Germany. The bridge over federal highway 10 enables rapid access from Hinterweidenthal to the nearby rail station. Mürmann Thread Technology supplied the bracing components and hanger rods (system size M24) for the curved beams of the tied arch bridge. The equipment for the hydraulic pretensioning was supplied by Mürmann. The bridge is to be hoisted into position at the beginning of 2018. Before that the pretensioning of the crosslinking (system size M56) of the bridge supports, with the required pretensioning of 450 kN, will be completed.